The bathroom is a room with special requirements: high humidity, humidity differences. That’s why making repairs in the bathroom, you need to definitely plan the whole working process, to consider the sequence of measures to be performed. In the following article, you will learn the way to begin the repair in the restroom and what types of work should be carried out together with your own hands. Step-by-step instructions for toilet repair

Phase 1: drawing up a plan and deciding on a layout solution.

Repair in the bathroom can be of 2 types:

Begin repairs at the toilet is to find out the design, interior. Think through the last detail, what will be the space, select a colour. Pastel colours are traditional, in addition to a combination of blue and blue, pink or cherry with beige.

Begin repairs in the bathroom is to find out the design, interior layout. Consider detail, what will be the space vsyakuhnya.ru, choose a color. Pastel colors are thought to be traditional, as well as a combination of colors.

Next point is the option of facing material. Generally, finishing in the toilet is done with tile, porcelain tiles, mosaicand vinyl panels. Examine the pipes, if it needs to be replaced. If necessary, select the right option. Proceed to the measuring function: quantify all sides, figure out the area of the room. Based on these information, we indicate the location of the plumbing fixtures.

Step 2: the choice of sanitary fixtures and substance for completing.

It’s crucial to understand that the purchase of sanitary ware simplifies the preparation stage, rather than vice versa. This means that first we create a new design project, make a plan, and then go to the store. The following point – you should specify how big your favorite plumbing fixtures and examine the plan, whether it matches.

It’s very important to realize that the purchase of plumbing fittings is preceded by a planning stage, and not vice versa. This usually means that first we develop a new design project, make a plan, and then go to the store. Another one

In terms of stuff for finishing, it’s better to buy them immediately for the whole repair cycle, and that then you will not be distracted if something was missing. Do not forget about preparing the necessary tools.

Step 3: dismantling tiling and plumbing.

Once All of the preliminary work is done, move on to the beginning of the task process:

Step 4: Cost of communications: plumbing, electrical wiring.

Very often in an older home, you should carefully inspect and replace not only the pipes that are in the bathroom itself, but also the main riser, and on occasion the interfloor pipes. Why is it worth doing this? Old pipes anytime can give a flow, then the new fix is going to be emptied, it will call for additional investment to eliminate flaws.